EITC 2 Site Tour :: 2005-Mar-18
Sub-atrium between EITC 1 & 2
East view from Faculty of Engineering General Office suite
Access to the Admin-UMSU tunnel awaiting removal of old infastructure
Basement medium-sized classroom
Another basement classroom
Looking up at EITC 3 ventilation ducts in the atrium
Looking south and upward from the atrium between EITC 1 & 3
Main atrium stairway from basement
Classroom with construction dust in the air
Detail of fireproofing treatment at wall seam
Cable tray, more fire-proofing
Gord's shiny new boot surveying the elevator shaft
Lab space on north side
Future home of a Tim Hortons
Walkways spanning the atrium between EITC 2 & 1
«The Prow» of EITC 2 overlooking the atrium
EITC 3 ducts à la the movie «Brazil»
The «Grand Stairway» from the atrium to the upper levels
Future open-air lounge between EITC 1 & 3, on the 300 Level
Office space awaiting framing
Faculty offices, 400 Level east side
«The Pagoda» viewed from the 600 Level NE stairwell
South view across the east roof
South atrium face and roof
Atrium view from 600 Level CompSci Masters student area
View of EITC 1 infill construction, viewed across the atrium from the EITC 2's 600 Level
CompSci Masters student area on the 600 Level
Atrium roof, looking west at EITC 3
Gord has a passion for welding, 'nuff said
View from the 600 Level NE stairwell, looking east
View from the 600 Level NE stairwell, looking SE
Click on a picture to enlarge it.
Tuesday, May 3, 2005
Generated by
Galerie